 Click Here For The Energy Efficient Action Plan 1. Project
Citi Centre Office Complex Adelaide 2006 Savings 95% heat, 66% fans, 60% cooling Comments Installed to 2 floors retrofit from fan assist VAV to SMAC + Induction VAV. This technology is estimated to raise ABGR base from audit 2.5 to 5 ++. 2. Project Adelaide City Council Colonel Light Centre 2006 Savings Not determined, Eliminated simultaneous cooling and heating Comments Corrected problems with Dadanco active chilled beams of drafts and simultaneous heat and cool between ambients 17 to 28 degree C 3. Project Rolly Tasker Sails, Phuket, Thailand 2006 Savings over 50% total Comments Chiller reselected from 280 tonnes to 144 tonnes. Operating over 12 months and chiller not yet fully loaded. 4. Project Siam Cement Bankok, Thailand 2005 Savings 30% total. 900% increase in outside air. Comments Converted sick building to excellent and with 30% energy saving. 5. Project Art Gallery of South Australia 2004 Savings 70% heating 58% cooling when installed to 30% of site Comments AIRAH and NECA National awards refer www.brite.crcci.info - case study 10 6. Project Barmera Hospital South Australia 2002 Savings At least 50% cooling Comments NECA National Award of Excellence Winner http://smactec.com/smactec/data/uploads/8.pdf
|